If you need a little help deciding which application to fill in or how to fill it in, you can request a call back from our team and we'll be happy to give you a call.

Application forms and guidance for developers

All application forms and associated guidance documents for building projects in our region can be found by selecting the relevant tab on this page. All application forms are available in English and Welsh.

Building and development charges

Before you start the application process, it's worth having a look at our charges for building and development projects in the region, so you make sure you understand the costs.

Contact the team

If you have any questions, you can call the Developer Services team on 0330 678 1481.

Water connections

The forms you need to complete if you want to connect to the network for water.

Connecting to a 25mm or 32mm water main

If you need to connect to an existing, standard sized water main, you'll need to use the following form, whether your project is taking place in Wrexham or Powys:

Water connection from existing main - 25mm and 32mm (PDF)

You should only use these forms if you are: 

  • Building a new property
  • Converting a property
  • Upgrading an existing supply
  • Connecting a temporary building supply
  • Connecting an agricultural supply

Connecting to a 50mm water main

If you need to connect to an existing, large water main, you'll need to use one the following forms, depending on whether your project is taking place in Wrexham or Powys:

Large diameter water connection 50mm + (PDF)

If you need to requisition a new water main(s)

If your properties are not front facing or near to an existing main then you may require a new water main(s) into your development. This is usually only required for large developments, however if you have a smaller development and wish for us to check the layout first please don’t hesitate to contact us. If you require a new water main for your site you’ll need to download and complete the new water main application form (PDF).

If this is a NAV development, please download our NAV application form.

You can also complete a site served application form if required.

Diverting a water main

If you need to divert an existing water main as part of your development, you will need to download and complete the diversion of water main form (PDF).

Welsh language application forms

Waste connections

The forms you need to complete if you want to connect to the sewer network.

Connecting to an existing sewer

To connect to an existing sewer, you will need to download and complete the sewer connection form (PDF)

Adopting sewers and drains

Sewer adoption is an agreement made between a developer and the water company. The developer promises to build and maintain a sewer to a standard agreed to by the water company and the developer. The developer is then responsible for the maintenance of the sewer for a set period of time.

If you need to adopt a new sewer, you must download and complete the sewer adoption form (PDF).

Requisition of a new sewer

If you're unable to make sure your building project or development drains to a public sewer, because the land between your site and the sewer is owned by a third party who won't allow you to access the land, you can make a formal request to have a public sewer installed. This is called a requisition. 

To do this you will need to download and complete the sewer requisition form (PDF).

Divert an existing sewer

It might be that you need to divert an existing sewer pipe during the build or development process. If you do, you will need to download and complete a sewer diversion form (PDF).

Please see our Section 185 flow chart (PDF), which details what can and cannot be considered for self-lay diversions, along with a high-level summary of our processes.

Welsh language application forms

Development enquiries

If your site is still at pre-planning or planning stage and you wish to find out more about the local network capacity and how we would supply your development, you may wish to submit a Development Enquiry. Please note these are first and foremost feasibility applications and are usually more suitable for larger development sites or commercial schemes with high water usage proposals. If your site is past the planning stage or you require a quotation or connection please submit one of our formal connection applications.

If you wish to continue with a Development Enquiry, you'll need to download and complete a water and drainage capacity assessment form for a proposed development.

We also have a Welsh Language water and drainage capacity assessment form.

Guidance for developers

 

Our guides can help you if you're new to building and developing and need to understand the process of applying to carry out work affecting water and waste pipes. You can read or download our developers' guides in PDF format.

 

Water fitting regulations

It's important that you ensure all work you carry out meets the requirements and standards set out in the UK's water fitting regulations.