Building and Developing
Before I apply
- Do Hafren Dyfrdwy do the connection?
- How do I calculate my sewage flow rate?
- How do I know if there is a public sewer nearby to connect a new service to?
- How do I know which sewer I should connect to?
- I am having a new bathroom/kitchen. What do I need to do?
- I have a manhole on my land, can I connect to it?
- I have a public sewer on the site of my development, what do I need to do?
- What is the difference between a direct and indirect connection?
- Where can I find a recommended contractor?
Charges
- Can I apply for a water and sewer connection at the same time?
- Can I talk to someone before I submit and pay for my application?
- Do I need to complete an application form for every connection?
- I am doing the work myself, do I need to supply a risk assessment?
- I've submitted an application, what happens next?
- What does the contractor risk assessment and method statement need to include?
- Why do I need to provide my contractor details?
Applying
- Can I apply for a water and sewer connection at the same time?
- Can I talk to someone before I submit and pay for my application?
- Do I need to complete an application form for every connection?
- I am doing the work myself, do I need to supply a risk assessment?
- I've submitted an application, what happens next?
- What does the contractor risk assessment and method statement need to include?
- Why do I need to provide my contractor details?
Approval
Connections
- Can I connect via backdrop?
- Can I have a combined foul and surface water connection?
- How will I know the location of the stop tap & meter?
- Once I've laid my service pipe, how long will it be before you complete the connection?
- What is a soakway?
- What is the difference between a foul sewer and a surface sewer?
- What type of connection can I use to connect to a public sewer?
- Who can carry out work in third party land?
Inspection
Adoption
General
Phone
(collapses content)